Titanium-zinc plate, aluminum-magnesium-manganese plate, aluminum-magnesium-manganese roof panel installation node processing method
- Categories:Company Dynamics
- Author:
- Origin:
- Time of issue:2018-09-04 14:28
- Views:
(Summary description)The most important thing in the installation process of the aluminum-magnesium-manganese roof panel is the processing method of the roof panel nodes. The 360-degree vertical edge of the upper port of the aluminum-magnesium-manganese plate head is fixed with rivets to the aluminum-magnesium-manganese roof block, and the vertical side and the aluminum alloy bracket are fixed with rivets. To prevent the roof panel from sliding and shifting as a whole due to temperature changes; or due to external force, the roof panel’s vertical side undercut is not tight and shifts and slides. Note that the upper and lower ends of the aluminum-magnesium-manganese roof panel can only be fixed at one end with rivets. Aluminum should be considered. The coefficient of thermal expansion and contraction of magnesium-manganese plate.
Titanium-zinc plate, aluminum-magnesium-manganese plate, aluminum-magnesium-manganese roof panel installation node processing method
(Summary description)The most important thing in the installation process of the aluminum-magnesium-manganese roof panel is the processing method of the roof panel nodes. The 360-degree vertical edge of the upper port of the aluminum-magnesium-manganese plate head is fixed with rivets to the aluminum-magnesium-manganese roof block, and the vertical side and the aluminum alloy bracket are fixed with rivets. To prevent the roof panel from sliding and shifting as a whole due to temperature changes; or due to external force, the roof panel’s vertical side undercut is not tight and shifts and slides. Note that the upper and lower ends of the aluminum-magnesium-manganese roof panel can only be fixed at one end with rivets. Aluminum should be considered. The coefficient of thermal expansion and contraction of magnesium-manganese plate.
- Categories:Company Dynamics
- Author:
- Origin:
- Time of issue:2018-09-04 14:28
- Views:
The most important thing in the installation process of the aluminum-magnesium-manganese roof panel is the processing method of the roof panel nodes. The 360-degree vertical edge of the upper port of the aluminum-magnesium-manganese plate head is fixed with rivets to the aluminum-magnesium-manganese roof block, and the vertical side and the aluminum alloy bracket are fixed with rivets. To prevent the roof panel from sliding and shifting as a whole due to temperature changes; or due to external force, the roof panel’s vertical side undercut is not tight and shifts and slides. Note that the upper and lower ends of the aluminum-magnesium-manganese roof panel can only be fixed at one end with rivets, and aluminum should be considered. The coefficient of thermal expansion and contraction of magnesium-manganese plate.
1. At the head end of the roof panel near the ridge or parapet wall, use a roof panel flanging device to curl up the installed roof panel port, and the curling height is about 50-70mm. In order to prevent the roof with a small slope, the rainwater will pour into the inside of the panel and cause water leakage. Even a large slope roof is a necessary process to prevent the wind and rain from pouring into the bottom of the roof panel and add a piece of insurance.
2. The aluminum alloy ridge seals that are consistent with the roof panel are ordered in the factory, and the aluminum alloy seals are made by combining the aluminum alloy seal shell and the inner foam sealing strip. The vertical seam roof ribs and the ridge cover The joint between the board and the roof ridge seal is fixed with rivets in the middle, so that even if the exposed rivet leaks, the rainwater will drip on the roof panel instead of the room.
3. The internal corners of the roof and the joints between the roof panel and the gutter. Each aluminum-magnesium-manganese roof will have a negative corner. The quality of the internal corner will directly affect the waterproof and safety of the overall roof. There is a possibility that the roof panel will be overturned by high winds. In the past aluminum-magnesium-manganese metal roofing projects, the use of safe, reliable, and new-type joint processing methods is not to be underestimated. The distance between the roof purlins at the side of the gutter connected to the roof slab and the gutter is 150mm, and not greater than 170mm, the other end of the roof panel should be inserted into the gutter about 150mm in length to ensure that the length of the lower port of the roof panel and the fixed seat is controlled within 250mm. The end of the panel that goes deep into the gutter is best to use a roof panel flanger. The bottom flanging is processed to form a water droplet to ensure that rainwater does not flow back to the inside of the panel.
4. The flashing plate installed under the aluminum-magnesium-manganese roof panel can waterproof and fold the various materials inside the roof system to prevent exposure.
A water baffle is arranged on the rib of the aluminum-magnesium-manganese roof panel. Generally, the slope of the metal roof is relatively large, and the speed of rainwater is very large. In order to prevent the rainwater from entering the opposite roof panel, the water baffle can play the role of slowing down the rainwater.
5. For the weak links in the roof that need to pass through the side of the object, the gable, etc., the method is to simply connect the gable cover to the outermost rib of the roof with self-tapping screws, and the nail holes must penetrate the inside and outside of the roof. Once the seal fails, water leakage will occur. We must be careful when dealing with weaknesses, and work out scientific, reasonable and reliable plans.
Scan the QR code to read on your phone
More News
-
Aluminum-magnesium-manganese roofing panels, aluminum-magnesium-manganese board manufacturers, precautions for aluminum-magnesium-manganese roof construction
The construction procedures of the aluminum-magnesium-manganese roofing system should be arranged to be continuously completed in an independent construction section. In the construction of the roofing project, if there is a project construction that is higher than the roof in the adjacent area, the construction should be started after the wet work of the adjacent project is completed to protect the roofing project from being damaged or being used as a supporting surface for scaffolding. The aluminum-magnesium-manganese roofing system shall be started after all the processes of its supporting members are completed. - Titanium-zinc plate, aluminum-magnesium-manganese plate, aluminum-magnesium-manganese roof panel installation node processing method 09-04